CESC Campus

Kolkata, India
heritage CESC img-1

Challenges faced

  • The top strata of the soil was unstable.
  • The moisture content in the land was more due to the high water table.
  • There were logistical challenges as the site was in a cooped up location.
heritage CESC img-2

Solutions provided

  • For having a grip on the land mass, a mechanical grab was utilised from a distance away from the Guide wall.
  • Further, In some regions, soil stabilization/pressure grouting was done before excavation.
  • We moved in the materials required for construction when the space had little movement from people around.